Non-Potable Labelling and Outlet Control

Make the system understandable to occupants, visitors and future workers.

Labels help prevent accidental drinking, incorrect plumbing alterations and unsafe hose connections. Colour, wording and placement requirements vary by jurisdiction.

Key planning decision: Create a simple system diagram and place durable labels at tanks, pumps, valves, outlets and accessible pipe runs where required.

Plan the whole path

Rainwater projects work best when this topic is connected to roof drainage, storage, intended use and safe overflow. A component that performs well by itself can still create a weak system when it is inaccessible, undersized, incompatible with other parts or used outside its approval.

Begin with a sketch showing elevations, pipe routes, isolation points, maintenance access and the route water follows when something is blocked. For larger, buried, indoor or potable systems, use qualified local professionals and the current rules adopted by the authority having jurisdiction.

Planning steps

  1. Use the exact local wording and colour standard.
  2. Label outdoor taps at eye level.
  3. Keep a diagram near controls or building records.
  4. Brief tenants, staff and maintenance contractors.
  5. Replace faded or damaged labels.

Cost and performance factors

Costs vary with tank size, material, delivery access, excavation, structural support, plumbing, power, treatment, permits and restoration. Compare complete scopes. A cheaper component can be more expensive over time if it clogs often, wastes collected water or requires difficult access.

Performance should be judged against measured demand and local rainfall timing. Annual averages are useful for screening an idea, but month-by-month or event-based analysis is more reliable for major investments.

Risks and limits

  • Labels do not replace cross-connection protection.
  • Children and visitors may not understand symbols alone.
  • Unlabelled buried pipes can be misidentified later.
  • Do not imply water is safe for uses not approved.
Health and code boundary: This page is general education. It does not approve potable use, plumbing connections, structural support, excavation, electrical work or drainage discharge in your location.

Questions to resolve before purchase

  • What end use is approved and what water quality does it require?
  • What happens during the longest likely dry period?
  • What happens when the tank, filter or pipe is full or blocked?
  • Who will inspect and maintain this part of the system?

Document the final system

Keep a diagram, product manuals, permit records, test results where applicable, valve positions, winter procedures and a maintenance log. Clear records help future owners, tenants and contractors avoid unsafe alterations.